-- card: 81748 from stack: in -- bmap block id: 81005 -- flags: 0000 -- background id: 68193 -- name: Project Calendar DBOX -- part 8 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=90 right=271 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: -- part 11 (field) -- low flags: 01 -- high flags: 2002 -- rect: left=258 top=209 right=231 bottom=432 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: InBox -- part 5 (button) -- low flags: 00 -- high flags: 2000 -- rect: left=24 top=83 right=268 bottom=198 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 0 -- text size: 12 -- style flags: 0 -- line height: 16 -- part name: clock ----- HyperTalk script ----- on mouseDown show card field popupClock end mouseDown on mouseUp hide card field popupClock end mouseUp -- part 10 (field) -- low flags: 81 -- high flags: 2004 -- rect: left=201 top=100 right=226 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: popupClock ----- HyperTalk script ----- on mouseUp hide card field "popupClock" end mouseUp -- part 12 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part contents for card part 8 ----- text ----- The Calendar window lets you view or define the characteristics of a calendar. You can establish as many calendars as you need and assign resources to them. The Project Calendar is used for all task durations and for resource durations if that resource has not been assigned another calendar. -- part contents for card part 10 ----- text ----- The clock determines the work day schedule for the days of the week selected in the bar above it. Each day can have its own work hours. 1. Click or Shift-click to select one or more days of the week. 2. Click or drag through the clock to set the times for those days. -- part contents for card part 11 ----- text ----- Press any element for details. -- part contents for background part 30 ----- text ----- The Dates Menu -- part contents for background part 31 ----- text ----- Calendar Window -- part contents for card part 12 ----- text ----- 1 of 2